The qualifications to the redelivery notice were construed by the arbitrators to mean..
fme: Force Majeure Excepted
wp: weather permitting
uce: unforeseen circumstances excepted
wog or wag: without guarantee
agw: all going well
wp : without prejudice
fcl : full container load
lcl : less container load
OOG : out of gauge, overized cargo , on flat rack or open top container
CY/CY : rate is valid from container yard to container yard - used for container shipments only
DC container : Dry cargo container =standard closed box container
DV container : Dry van container = standard closed box container
GP container : General purpose container = standard closed box container
HC container : High cube container = container which is 1'(abt 30 cm) higher than normal containers
OT container : open top container
FR container : Flatrack container
RF container : Reefer container (can maintain fixed termperature during transport, cold or warm)
COC : carriers own container
SOC:shipper's own container
Liner terms,hook to hook : rate includes seafreight, loading to vessel, lashing and securing, unlashing and discharge.
any cost to hooking/unhooking not included, nor any landside/teminal cost whatsoever.
fios : free in and out, stowed. it means that loading and discharge of goods, stowage, lashing and securing, is additional and not included in price
free out : consignee shall arrange and cover cost of discharge of cargo from vessel
fot : free on truck. loading and unloading of cargo to/from truck is not included.
filo : free in/ free ot. it means that loading incl. lashing & securing of goods are excluded in the price, but discharge cost are included in the price.
lifo : liner in/free out. vice versa of above
basis 1/1 : basis 1 port to 1 port
bbb : before breakbulk bulk. refers to freight payment that must be received before discharge of a vessel commences. offen used when transit time is short.
b/b : breakbulk cargo
bends : both ends(load &discharge port)
bod : board of directors approval.
broken stowage : the cargo space which is unavoidable lost when stowing cargo. the percentage of wasted space depends upon e.g the kind of cargo. the packing and the used space.
chopt : charterers option
cob : closing of business hours
cog : center of gravity
cp (or c/p) : charterer party
dwt : dead weight ton - definition of vessel size
fhinc : fridays, holidays included(muslim countries)
grace period : agreed free time in pol/pod before detention cost will count
gsbaaaa : on good safe berth, always afoat, always accessible
hot permit : permit to perform welding work
loa : length overall of the vessel
l/s/d/w : lashing, securing, dunnaged, welding
molchopt : more or less charterer's option
nor : notice of readiness
non-reversible : detention. if loading completed sooner than expected, then saved days will not be added to discharge time allowed.
part cargo : expression used when booking with breakbulk carriers in tramp service. part-cargo means that only part of the vessel is booking.
pdpr : per day pro rata
recap : recapitulation of the terms and condtions agreed
shex ; sundays, holidays excluded
shinc : sundays, holidays included
sshex : saturday, sunday, holidays excluded
sof : statement of facts
tbn : to be named/to be nominated
w/m rt or fr : weight or measure, revenue ton, freight ton : 1 ton equals 1 cbm
'Shipping story' 카테고리의 다른 글
View of Coil dischage (0) | 2024.03.21 |
---|---|
코일 적재가이드 / GUIDE TO COIL STUFFING (0) | 2024.03.21 |
RORO Operation (0) | 2023.06.07 |
Fixture note (1) | 2023.04.12 |
Transportation Boat by Container (0) | 2023.02.03 |